Consumers Energy is on the fast track for approval of permits to install two deep injection wells in Port Sheldon. The wells will be used for long term storage of ‘’non-hazardous wastewater generated from the JH Campbell” plant. 

Around the 13:00 mark this was discussed by the Groundwater Board: https://www.youtube.com/live/-1vOkK6Grlc . It provides additional helpful information.

Based upon this additional information and other information gathered, there should be a public hearing and more investigation on the topic, as explained at https://savethecampbell.com/a-pertinent-issue-with-the-campbell-and-another-example-of-why-we-need-local-control-of-our-electric-grid-through-our-own-electric-cooperative/

Leave a Reply

Your email address will not be published. Required fields are marked *