In a four to one vote, the Blendon Township Board passed the 2nd Round of Campbell Resolutions, after a number of people spoke in favor. This is truly a group effort. And it is another step in our project to thwart the Net Zero agenda by God’s grace.
The following 6 townships have thus passed the 2nd Round of Campbell Resolutions:
- Georgetown
- Jamestown
- Wright
- Polkton
- Zeeland Township
- Blendon
We are optimistic more will follow, and we are encouraging the County Board to as well.
At the end of the meeting a representative of Key Capture who is seeking to build the lithium ion battery plant in Blendon approached me, and we discussed the issue. I encouraged him to explain to Key Capture management that they would be wise not to proceed with their plans in Blendon, because this electric cooperative in the works would make it very difficult for them to do business there, given the overwhelming desire of Blendon residents who do not want the battery plant in Blendon Township. PA 233 cannot thwart the “Save The Campbell” strategy to undermine the Net Zero agenda, because the “Save the Campbell” strategy uses a different method to foil it that is not addressed in that legislation. Key Capture may build the battery plant, but a locally controlled electric cooperative controlling the grid would have ways to put the battery plant out of business. He looked concern, as well he should.
My speech to the Blendon Township Board explained the rationale to support these resolutions..